Facebook
Contact Us
YouTube
shadow

Boilex™ Tower Stove

Assembly Instructions

shadow

Tower Stove Keyline Diagram

  1. Lay the 4 sides as shown.
  2. Slot the sides together to create a square stove. Place the assembled stove with the 2 holes at the bottom. Press the base 1mm into the ground or pack with sand or soil to seal.
  3. Position one c100g Zip™ Fuel block in the bottom of the stove and light the corners in situ via the open top or one of the lower holes in the stove.
  4. Allow 60 seconds for a yellow all over flame to appear and then place pot or pan of water or food on the stove. The flame will turn blue indicating a clean burn.
  5. Cook as required and once complete extinguish any unused fuel by smothering with sand, soil or water.

Product Range

SIGN UP TODAY

For more information on all Boilex™ stoves and Zip™ Cooking Fuel
Facebook
Contact Us
YouTube
Close Section

SIGN UP

Sign up today for more information!

Thank you for your interest in Zip™ and Boilex™ Cooking Systems. Just fill in your details below and will share with you our latest product news and information.